BCP Risk & Control

One recovery plan. Every branch. Ready when it matters.

Most continuity plans are written process by process, until every branch has fifteen documents nobody opens in a real disruption. We plan branch operations as a whole: the phases of a disruption, six approved operating modes, alternate processing with real controls, and a routing matrix every manager can run.

Aligned to FFIEC BCM, NIST, and ISO 22301 expectations. Delivered by a US-based cyberteam.

The Problem

A plan for every process is a plan no one can run.

Walk into most institutions and branch continuity lives in a stack: one document for teller operations, another for the drive-up, another for the vault, the ATM, new accounts, wires, and on down the list. Fifteen documents per branch, multiplied across the network. When a storm knocks out power at 6 a.m., no branch manager is reading fifteen documents.

The unit of recovery isn’t a process. It’s the branch. What a manager actually needs to know is whether the branch can open, in which mode, with which services, and where to send customers if it can’t. That takes one plan for the whole network, a two-page at-a-glance, and a set of controls that make reduced-service and manual operation safe.

The Plan

Six building blocks. One plan the whole network runs on.

Built from real engagements with multi-branch community institutions, each element answers a question a branch manager actually asks during a disruption.

Modes

Six operating modes

From normal operations through reduced service, drive-up only, appointment only, manual processing, and temporary closure. Mode selection is approved and documented per event, so “partially open” is a controlled state, not an improvisation.

Services

Critical services & recovery objectives

Every branch service carries a criticality, a recovery objective, and an approved continuity approach, so restoration follows a defined order when systems or staffing are constrained.

Alt processing

Alternate processing controls

Manual operation is pre-engineered: approved transaction types, offline limits, identity verification, dual control, sequential logging, and reconciliation when systems return.

Routing

Branch routing matrix

Every branch is tiered with a primary and secondary alternate, so customer redirection is a lookup, not a judgment call made under stress.

Standards

Minimum-to-open standards

Clear thresholds for staffing, security, facility safety, cash and dual control, technology, and communications. A branch opens when the standards are met or compensating controls are approved.

At a Glance

Two-page companion

Page one: what to do. Page two: who to call. The entire plan compressed to what a branch manager needs taped inside the cash room, verified quarterly.

Phases
Every disruption moves through four phases. The plan covers each one.
01 · RESPOND Safety first · activate the plan Select the operating mode 02 · OPERATE Alternate processing · routing Customer & staff communications 03 · RESTORE Reopening checklist · verify Reconcile manual transactions 04 · IMPROVE After-action review Corrective actions & owners Scenarios covered: single branch · multi-branch weather · systems outage · staffing shortage · cash-delivery · cyber event · public health
Tiering
Recovery objectives are earned by criticality, not assigned by default.
TierCriticalityMTDRTORPOTypical systems
1Mission critical4h3h0Wires, payment rails, sanctions screening
2Critical24h18h1hCore banking, identity, email, backup infrastructure
3Important48h36h4hLending, document, and analytics systems
4Standard72h54h24hFile shares, vendor portals, regulatory reporting
5Deferrable168h126h24hReference data, supplies, niche vendors

Most institutions start with one flat recovery window for everything. Tiering focuses spend and testing where the hours actually matter.

Inside the Deliverable

What a branch manager sees. Sanitized from a real engagement.

Two excerpts from a recovery plan we built for a multi-branch community bank, with identifying details removed.

One Program

Branches are one chapter. The program covers the enterprise.

Business continuity spans technology, facilities, and bank operations, and the deliverables coordinate instead of contradicting each other. Every plan ships with a two-page at-a-glance its owner can actually run.

Operations

Branch & enterprise recovery plan

The network plan detailed on this page: operating modes, routing matrix, minimum-to-open standards, and alternate processing controls for the whole branch footprint.

Departments

Department continuity plans

Each critical department gets a right-sized plan: a team leader and alternate, a designated recovery team, an alternate facility, and functions grouped by recovery window from 24 hours to 30 days.

Technology

IT disaster recovery

Tiered recovery with clear activation criteria, a first-60-minutes timeline, defined scenarios including cyber isolation, and coordination with incident response so restoration never outruns forensics.

Playbook

Manual procedures playbook

Your existing business process documents, consolidated into one playbook for operating without core systems. Where your procedures have gaps, we flag them for a decision rather than inventing language your staff has never seen.

How It Works

From document sprawl to one plan, tested.

Program Build

Sequential

Step 01

Risk assessment

Weeks 1-2

Technology risks and business continuity risks, from connectivity loss and cyber events to fire, flood, and physical security threats, assessed against your footprint.

Step 02

Business impact analysis

Weeks 2-5

Technology, facilities, and operations are analyzed and tiered. Every system and function earns its MTD, RTO, and RPO by criticality instead of inheriting one flat window.

Step 03

Recovery plans

Weeks 5-10

The branch network plan, department plans, IT disaster recovery, and manual procedures playbook are built as one coordinated set, each with its at-a-glance companion.

Step 04

Test & maintain

Annual cycle

Exercises run on the cadence below, findings become corrective actions, and plans update after every branch, vendor, or system change.

Testing cadence

Quarterly

Branch management reviews plan documents and verifies contacts and at-a-glance accuracy.

Semiannual

Emergency notification and phone-tree test across the branch network.

Annual

Tabletop exercise covering a Tier 1 branch, plus a functional manual-processing test: log completion, approval, posting, and reconciliation.

Annual

Multi-branch severe weather exercise covering staffing, communications, cash, and alternate routing.

After incident

After-action review with corrective actions, owners, and due dates tracked to closure.

Outcomes

What done looks like.

Runnable

A plan people can run

One network plan and a two-page at-a-glance replace the binder stack. Any branch manager can select a mode, route customers, and operate safely without calling headquarters first.

Controlled

Safe in degraded mode

Reduced service and manual processing carry pre-approved limits, dual control, logging, and reconciliation, so operating through a disruption never becomes a compliance finding after it.

Tested

Proven before it’s needed

Tabletops, functional manual-processing tests, and multi-branch exercises run on a documented cadence, with findings tracked to closure and reported to the board.

Could every branch manager run your plan at 6 a.m. in a power outage?

Bring us your current continuity documents. In 30 minutes we’ll show you what one network plan would look like for your branches, and what it takes to get there.